MS Nordkapp Retrofit
During a yard stay for five days in Ølen, Norway 2013, we replaced an old ABB MP200 System onboard.
Vessel Information
Build: 1996
Owner: Hurtigruten AS
Segment: Cruise - RoPax
During a yard stay for five days in Ølen, Norway 2013, old ABB MP200 system was replaced with new Høglund Solutions:
- Integrated Automation & Control-system
- Clutch Control System
- Engine Safety System (ESS)
- Power Management System (PMS)
- HVAC System, with control off all ventilation fans and heating/cooling
- Safety System for the MaK main engines & Gear
- Safety Systems for the Bergen Aux Engines
- GMR Playback
- Høglund Remote Control, for remote service and support
- AC Compressor & Cargo Compressor, Control System
This was a “turn-key” contract. Høglund project and commissioning engineers arranged :
- Approbation with Factory Acceptance Test together with DNV-GL
- Cable Pulling
- Installation, Re-connection and I/O check
- Harbour Acceptance Test with DNV-GL
- Sea Acceptance Test with DNV-GL
After the sea-trial Høglund handed over the new system with all approved certificates needed.