Olympus Retrofit

During a 7 days dry-dock period in Denmark, we replaced 10 year old Lyngsø automation system with new Høglund Solutions

Vessel Information
Built: 2006
Owner: Sirius Shipping
Segment: Tankers - Chemical Tanker


During a short 7 days dry-dock period in Denmark, we replaced 10 year old Lyngsø automation system with new Høglund Solutions. Vessel owner and shipyard representativs were extremly suprised that we managed to perform this upgrade during sucha short dry-dock period.

Høglund Solutions Onboard:

  • Integrated Automation System (IAS) with Cargo Control
  • Power Management System (PMS).
  • Ship Performance Monitor (SPM)
  • GMR Playback with 5 month recording of every signal every second.
  • Høglund Remote Control, for remote service and support.


Old Lyngsø Controller

Old Lyngsø I/O Cabinet

ECR with old Lyngsø operation stations

Høglund Retrofit Manager working

Old Lyngsø I/O Modules are removed

Høglund Retrofit team in action installing new S800 hardware

New AC800 Controller and S800 hardware

New I/O cabinet with ABB S800 hardware

Engine Control Room with new Høglund operation stations and widescreen monitors

Cargo Control with new Høglund operation stations and widescreen monitors

This was a “turn-key” contract. Høglund project and commissioning engineers arranged :

  • Approbation with Factory Acceptance Test together with DNV-GL
  • Cable Pulling
  • Installation, Re-connection and I/O check
  • Harbour Acceptance Test with DNV-GL
  • Sea Acceptance Test with DNV-GL

After the sea-trial, høglund technician sailed with the vessel and attended first cargo loading and offloading operation.


Sirius Shipping Case Study

Description Type Link
Case Study: Sirius Shipping pdf DOWNLOAD